House completion levels: shell, white box or turnkey, and which to order

House completion levels, meaning shell, white box and turnkey, are words families first meet in quotes and that nobody explains. They are not official terms: each supplier defines their own content. That is why two quotes both promising a white box are often for very different scopes.

This article sets out eight differences between house completion levels: what each contains, what stays with the client, how to compare prices and liability, and when each choice makes sense.

1. The three house completion levels in short

A weathertight shell is a building closed against the weather: the load-bearing structure, the roof with its covering, windows and external doors, the facade. It is dry and lockable but empty inside. A white box goes a step further: partitions, insulation and internal lining, usually the pipework and cabling of the technical systems, and filled or plastered surfaces. A turnkey house is finished: finishes, technical systems with their equipment, kitchen and sanitary ware.

Of the three house completion levels, only the last has a roughly common meaning, and even that differs between suppliers. What our own complete offer includes is set out in our article on the turnkey house price.

Bremen house from outside – house completion levels start with a weathertight shell
Bremen house

2. What stays with the client

This is what house completion levels really differ by, because every job not done is somebody’s job. A shell leaves the client the partitions, insulation and lining, the technical systems and their equipment, the finishing, the kitchen and sanitary ware, and the coordination of all of it. A white box leaves the finishing, the equipment, the kitchen and the furnishing.

Two of those lines are large enough to change a decision, so here are our own indicative figures: decent interior finishing starts from 400 €/m² + VAT, lower per square metre on larger houses, and the electrical work inside the house from 26 000 € + VAT.

Site preparation, the foundation, utility connections and outdoor works usually stay with the client anyway. The full list of budget lines is in our article on a house building budget.

3. How to compare prices properly

The most common mistake is to compare contract sums. The correct comparison is the total cost to move-in: the completion level plus every job outside it plus the time to coordinate them. List every line and mark whether it is in the quote or with the client.

The schedule belongs in that comparison too: with a lower level a second project begins once the house is up, with its own tenders and deadlines.

4. Liability and guarantee

This difference is the least noticed and the most important. When one company builds the whole house, there is one liable party and one guarantee. When the house is built in parts, each trade answers for its own part and the borderline cases fall to the client. The classic example is moisture damage where one company installed the insulation and another the vapour barrier; if you split those jobs, the contract has to say who is liable for airtightness.

A lower completion level is therefore not only a financial choice. The division of liability and the clauses of a contract are covered in our article on a construction contract for a turnkey house, and what goes wrong behind a finished surface in our article on hidden construction defects.

Iceland house in Saku – the completion level decides how many liable parties there are
Iceland house in Saku

5. What has to be written down for a shell

Because the term is not defined in the Estonian Building Code or in any standard, it belongs in the contract line by line: the load-bearing structure and its material, the roof structure and covering, the windows and external doors with their glazing, the facade with its ventilation and wind barrier, and whether insulation is included.

That last point causes the most disputes: one supplier’s shell includes insulation, another’s does not. Ask for it in writing and attach it to the contract.

6. What has to be written down for a white box

Three things are critical here. First, whether the pipework and cabling of the technical systems are installed and to which design, because that decides how simple the later fitting of equipment is. Second, the state of the internal surfaces: filled, primed or only boarded. Third, whether the floor bases are done, including the underfloor heating loops and the screed.

The third matters most, because the underfloor heating solution has to be decided before the concrete is poured. The logic of designing it is in our article on underfloor heating in a new house.

7. When a lower completion level makes sense

The lower house completion levels suit a family with construction experience or trusted trades available, a staged budget where part of the work happens a year later, or a wish for complete freedom in the finishes. They take time, though: self-managed work runs longer than a quote suggests. When it does not pay off is set out in our article on building a house yourself or hiring a builder.

8. When turnkey makes more sense

When the family works full time, has no construction experience and wants a firm date and a single liable party, a turnkey house is usually cheaper than it looks. The reason is not the price but what the client never has to do: tendering, coordination, supervision and waiting. A bank also looks at the whole project, and staged construction under several contracts is harder to finance, as our article on building a house with a loan explains.

Denmark XL house – a complete service means one date and one liable party
Denmark XL house

Completion level and the occupancy permit

An occupancy permit is granted for a building ready to be used. A shell and a white box are not finished houses in that sense, so the permit follows only once the remaining work is done and the documents exist; moving in, and sometimes the final loan drawdown, has to wait for it.

Plan early who applies for the permit and who collects the documents, because records of concealed work sit with several companies. The requirements are in our article on the occupancy permit for a house.

Solutions in between, and who does the rest

You do not have to choose between three pure house completion levels. A common middle option is a house handed over with all the technical systems in place, where the family does only the floors, the painting and the kitchen; another is a complete service with the kitchen excluded. These keep the builder’s liability where it is technically critical and leave the client the jobs that are easy to order separately.

Whatever is left goes to one main contractor, to several trades the client coordinates, or to your own hands, the variant most often underestimated. Check the companies in the register of economic activities and in the business register.

Belgium house – the boundary between two trades belongs in the contract, not on site
Belgium house

Summary

House completion levels are agreements, not official terms, so their content belongs in the contract in writing, together with the boundary where one company’s work ends and the next begins. If you would like to see what our quote contains at each level, write to us through the contact page.

How long does it take from the first drawing to moving in?

Design takes on average one to three months and the building permit two to three months in practice. Construction itself takes about 22 weeks, and interior finishing can extend that.

Who decides the heating solution?

You do, together with us. The choice is between an air-to-water heat pump, ground source heating and solar panels, and cooling can be added to the house if you want it. We put together a more precise offer after a consultation.

Get in touch!

For 16 years we have helped people create the home of their dreams. We advise you at every step – from the first question to a home where it feels good to be.

TTUN4139

Your complete new-home solution from a single provider

We offer house design, handle all the paperwork from building permit to occupancy permit, and build turnkey houses. Every house is built to an individual design. Working with our architect, you decide the size, floor plan and finishing materials of your house. We take into account both the shape of your plot and the path of the sun, and we can combine details from different houses to find the solution that suits you best.

We can also build projects that already have a building permit.

icon11

Award-winning design

Functional houses with timeless design and plenty of space
icon3.svg

Energy class A

Heating, ventilation, heat retention
icon1.svg

50-year warranty

On the structure and 2 y. on workmanship
icon8.svg

Choose your size and budget

A floor plan tailored to your wishes and budget
icon6.svg

Built fast

A turnkey house completed in five months

Award-winning CLT element houses with timeless design

Award-winning Happy Home designs and builds designer houses from cross-laminated timber (CLT). We have long-standing experience and offer home solutions for even the most discerning clients.

Our award-winning CLT element houses, with their timeless design, are created by architects, engineers and construction experts working together. Happy Home houses blend naturally into their surroundings and are built to last, in both construction quality and architecture.

We want to inspire people to live more environmentally conscious lives. We build sustainable thinking into each project from the design phase, when the first key decisions about materials and energy efficiency are made.

Yes. To request a price list, send us an enquiry through the form on our website. For an initial overview, we’ll send you sample price lists for our houses, showing design and construction costs as well as possible additional work. We can prepare a quote tailored to your needs after an initial consultation.

Preparing the design usually takes 1–3 months, obtaining the building permit around 2–3 months, and construction about 22 weeks. Interior finishing may extend the construction time. The exact schedule depends on the project, the solutions chosen and how quickly the necessary decisions are made.

Yes. We design every house individually. Working with our architect, you can choose the size, layout and finishing materials of your house. We take into account the characteristics of your plot and the path of the sun, and we can combine solutions from different houses. The floor plans on our website are examples that we can use as a starting point when designing your home.

Yes. Houses under construction can be visited by prior arrangement. We can also meet at our office or hold an initial consultation by phone or video call. We recommend sending us an enquiry before your visit so we can arrange a suitable site and show you the solutions that interest you most.

Yes. We also build houses designed by others. Before construction begins, we review the existing design and adapt the necessary drawings and technical solutions to our construction details.

If you already have a plot, we can handle the design, the documents needed for the building permit application, and the construction. Our scope of work does not include landscaping or furniture. You don’t have to order all the work from us – you can choose which work to order from us and which to arrange yourself.

Over 100 completed projects

Over 100 happy families

If you have a question, would like our price list or want to come and see our houses, write to us or give us a call.

Liisa Nirgi
+372 53 040 040
info@happyhome.ee