Award-winning prefabricated CLT houses with timeless design

Building a house from scratch: 7 steps to take once you own the plot

Building a house from scratch feels to most families like a large project with no obvious first move. The plot is there, a folder of dream houses is saved on Pinterest and the bank has quoted a preliminary loan amount, but the next step stays vague. There is a right order, and it starts with the plot, not with the house.

Below are the seven steps to a new detached house, and what we handle at each.

Step 1: gather the plot documents

Paperwork comes first, because it decides what may be built on the plot at all. Collect the following.

  • The detailed plan or, where there is none, the municipality’s design conditions: the building area, the permitted footprint, the number of storeys, the height and often the roof pitch and facade.
  • An extract from the building register at ehr.ee: existing buildings, valid permits and recorded restrictions.
  • Restrictions: protection zones, utility routes, easements and the coastal building exclusion zone, which can be checked on the Land Board geoportal.
  • Utilities: the distance to electricity, water, sewage and telecoms, and the network operators’ technical conditions for connecting.
  • A geodetic base plan and soil data, or the knowledge that a geotechnical survey will have to be ordered.

If the plot already carries a building, its register entry has to be cleared first, so read the rules for taking down an old building on your plot before you plan the schedule.

Our process starts exactly here: the architect reviews the plot documents and tells you which house and size fit.

Iceland house in Mändjala, Saaremaa – building a house from scratch starts with the plot documents
Iceland house in Mändjala

Step 2: set the budget frame and the financing

A real budget for building a house from scratch has many lines: the plot and its preparation, surveys and design, state fees, network connections, foundation and house, outdoor works, finishing and furnishings, and a reserve for surprises. Beginners budget only the house.

Two of those lines we can put indicative figures on. Decent interior finishing starts from 400 €/m² + VAT, lower per square metre on larger houses, and the electrical work inside the house from 26 000 € + VAT.

We send a model-based sample price list on request, with an explanation of what the price includes; a more precise offer follows a consultation. What a builder’s price covers and what stays outside it is set out in our article on the turnkey house price.

Set the frame before choosing a model, so the architect can propose a size and solution that fits it. For a loan decision the bank usually wants a contract with a fixed scope and a schedule, which a turnkey offer provides.

Step 3: define the family’s needs, not the square metres

This is the step families usually start with: which house. Start from daily life rather than square metres or pictures. How many bedrooms are really needed, is the home office permanent, do grandparents visit for weeks, does the sauna have to be inside, how much storage is needed.

That list becomes a room programme, far more useful to the architect than a target number of square metres. A well-planned smaller house is often more comfortable and cheaper than a large one with empty rooms. Our models can be adjusted in both size and layout on the houses page.

Step 4: choose the construction method and the builder

The main choices are a masonry house, a timber frame house and a solid-timber CLT house, compared in our article on masonry or timber house. A factory-built house gives a short build time and a predictable price; building on site gives flexibility in stages.

The decision has a second half: who you sign with first, and there is a real difference between hiring an architect first or going straight to a house manufacturer.

When choosing a builder, check five things: its own architect or not, the guarantee on structures and work, whether the permit documents are part of the service, whether CAR insurance covers the site, and whether finished houses can be visited. Our answers are on the construction info page and the houses on the completed projects page.

Japan house in Otepää – a completed factory-built house
Japan house in Otepää

Step 5: design and building permit

Once the model and the builder are chosen, the design is prepared and the permit applied for. The design takes one to three months on average and the permit two to three months in practice; a new detached house practically always needs one, while the building notice concerns outbuildings. The types of consent and the steps are covered in our article on the building permit in Estonia.

Our architect prepares the design and applies for the permit; the client signs as the owner and pays the state fee. File the connection applications with the network operators at the same time, because a connection point takes time and cannot be hurried by the build.

Step 6: contract, schedule and construction

The contract must state the price and its scope, the schedule, the payment terms, the guarantees, the insurance and who prepares the occupancy permit documents. A fixed scope is also the bank’s basis for paying out the loan in stages.

Construction starts after the permit is issued and takes about 22 weeks: foundation, shell erection in about a week, closing the envelope, services, interior finishing and handover; finishing choices can extend it. The heating decision lands here too — air-to-water heat pump, ground source or solar panels, with cooling if you want it. All the stages, and what the client decides in each, are in our article on house construction stages.

Norway house in Karikakra – house building as a factory-built house
Norway house in Karikakra

Step 7: occupancy permit and moving in

A house built under a building permit needs an occupancy permit on completion, filed in the building register with the construction documentation, as-built drawings and the energy label. Our project manager assembles these, because the site log and the certificates were prepared during the build. It matters to the bank and the insurer too: without it the house is not officially complete.

The energy label shows the energy class; what it means and how it affects heating bills is explained in our article on the energy class A house.

Four mistakes to avoid when building a house from scratch

  • The house is chosen before the plot is checked, and later it turns out the plan does not allow it.
  • The geotechnical survey is skipped and the foundation has to be redesigned mid-build.
  • Connection applications are filed late and the finished house waits for electricity.
  • Offers are compared by the price per square metre instead of by scope, and the cheapest turns out the most expensive once the extra lines are added. Why that figure misleads is explained in our article on the CLT house price.
Denmark L model – adjustable layout and size
Denmark L model

How to start with Happy Home

Send us the plot documents and a short description of your family’s needs, and the architect will tell you which model and size suit the plot; we can also show you a house under construction. Write to us through the contact page — building a house from scratch starts with your plot, not with a catalogue.

Where do I start building a house from scratch when I already own a plot?

With the plot documents: the detailed plan or design conditions, the building register extract and the restrictions tell you how large a house, and which kind, may be built there. Only then is it worth choosing a model, a builder and a budget.

How long does building a house from scratch take?

The design takes one to three months on average and the building permit two to three months in practice, after which the house is built in about 22 weeks. Interior finishing choices can extend that.

Should I choose the house before checking the plot?

No. The plan may limit the footprint, height, number of storeys or roof pitch, and a house chosen before knowing them may turn out impossible. Our architect reviews the plot documents before we talk about a model.

What does Happy Home do for a first-time builder?

The architect reviews the plot documents, helps choose a suitable model and size, prepares the building design and applies for the building permit. The project manager takes the build to the occupancy permit. The client covers the plot costs, the utility connections and the finishing materials.

Get in touch!

For 16 years we have helped people create the home of their dreams. We advise you at every step – from the first question to a home where it feels good to be.

TTUN4139

Your complete new-home solution from a single provider

We offer house design, handle all the paperwork from building permit to occupancy permit, and build turnkey houses. Every house is built to an individual design. Working with our architect, you decide the size, floor plan and finishing materials of your house. We take into account both the shape of your plot and the path of the sun, and we can combine details from different houses to find the solution that suits you best.

We can also build projects that already have a building permit.

icon11

Award-winning design

Functional houses with timeless design and plenty of space
icon3.svg

Energy class A

Heating, ventilation, heat retention
icon1.svg

50-year warranty

On the structure and 2 y. on workmanship
icon8.svg

Choose your size and budget

A floor plan tailored to your wishes and budget
icon6.svg

Built fast

A turnkey house completed in five months

Award-winning CLT element houses with timeless design

Award-winning Happy Home designs and builds designer houses from cross-laminated timber (CLT). We have long-standing experience and offer home solutions for even the most discerning clients.

Our award-winning CLT element houses, with their timeless design, are created by architects, engineers and construction experts working together. Happy Home houses blend naturally into their surroundings and are built to last, in both construction quality and architecture.

We want to inspire people to live more environmentally conscious lives. We build sustainable thinking into each project from the design phase, when the first key decisions about materials and energy efficiency are made.

Yes. To request a price list, send us an enquiry through the form on our website. For an initial overview, we’ll send you sample price lists for our houses, showing design and construction costs as well as possible additional work. We can prepare a quote tailored to your needs after an initial consultation.

Preparing the design usually takes 1–3 months, obtaining the building permit around 2–3 months, and construction about 22 weeks. Interior finishing may extend the construction time. The exact schedule depends on the project, the solutions chosen and how quickly the necessary decisions are made.

Yes. We design every house individually. Working with our architect, you can choose the size, layout and finishing materials of your house. We take into account the characteristics of your plot and the path of the sun, and we can combine solutions from different houses. The floor plans on our website are examples that we can use as a starting point when designing your home.

Yes. Houses under construction can be visited by prior arrangement. We can also meet at our office or hold an initial consultation by phone or video call. We recommend sending us an enquiry before your visit so we can arrange a suitable site and show you the solutions that interest you most.

Yes. We also build houses designed by others. Before construction begins, we review the existing design and adapt the necessary drawings and technical solutions to our construction details.

If you already have a plot, we can handle the design, the documents needed for the building permit application, and the construction. Our scope of work does not include landscaping or furniture. You don’t have to order all the work from us – you can choose which work to order from us and which to arrange yourself.

Over 100 completed projects

Over 100 happy families

If you have a question, would like our price list or want to come and see our houses, write to us or give us a call.