Drainage around the house: 8 things that keep the foundation and walls dry

Drainage around the house is work nobody sees, and its absence is noticed only when it is expensive to put right. On a new house it is one of the cheapest insurances: the excavation is open anyway, the crushed stone is on site anyway and the pipework is a couple of days’ work. Ten years later the same job means digging up a finished garden and restoring the planting.

1. When drainage around the house is needed

It is not an automatic requirement on every plot. Three things decide: the permeability of the soil, the groundwater level and the relief of the plot. Clay or moraine soil holds water, so a layer of water can build up against the foundation. A high water table does the same, and a house in a hollow collects the water of the surrounding area.

All three come out of the geotechnical survey, which is one reason it is done before the design. What the survey contains is set out in our article on a geotechnical survey before building.

Denmark house in Viimsi – drainage around the house is built while the excavation is open
Denmark house in Viimsi

2. Drainage and stormwater are two systems

They are constantly confused, but their tasks differ. Drainage collects and carries away groundwater from around the foundation. Stormwater drainage deals with water from the roof, the terrace and the drive, which arrives in large volumes over a short time.

The most common mistake is to join the two: the roof downpipe is led into the drainage pipe. In heavy rain, water is then pushed back to the foundation, exactly where it was meant to be taken away from. Roof water has to go its own way: to a soakaway, a ditch or a stormwater system.

The two are separate systems but belong on one drawing, and the third water line on a plot deserves the same attention — the options are compared in our article on wastewater solutions for a detached house.

3. How drainage around the house works

Technically it is simple. A perforated pipe is laid around the foundation, slightly below the level of its base, at a fall. It is surrounded by washed crushed stone and the whole package is wrapped in geotextile, which stops fine particles being carried in. Water moves from the soil into the stone, from the stone into the pipe and on to the collection point.

The fall is critical: the pipe has to run evenly downhill, because no fall, or the wrong direction, means water standing in the pipe. Inspection chambers go at the corners and at changes of direction, so that the system can later be checked and flushed.

4. Layers, backfill and ground levels

Drainage around the house depends as much on the backfill as on the pipe. If the backfill beside the foundation is made with the clayey soil found on site, water stays in it and never reaches the pipe. So the backfill is made with a free-draining material, usually crushed stone or sand, which directs water down to the pipe.

The same logic applies above ground, and this is where a good solution is most often ruined — not on the building site but in the garden. Hard surfaces fall away from the house, usually by at least a couple of per cent over a couple of metres, and soil never reaches higher than the moisture barrier in the foundation.

A narrow strip of crushed stone along the wall takes the splash from the eaves. These rules cost almost nothing in a landscaping design, and levelling the ground flat undoes much of what the pipe below is there to do.

Iceland house in Saku – the ground must fall away from the house, not towards it
Iceland house in Saku

5. Foundation waterproofing

Drainage around the house and foundation waterproofing are a pair that works together. Drainage takes the water away; waterproofing stops the remaining moisture moving into the structure. It is applied to the outer face of the foundation and horizontally under the wall, so that moisture cannot rise by capillary action.

For a timber structure this matters especially. A CLT wall must not be permanently damp, and the bottom of the wall is where moisture is most likely to reach. That is why these details are resolved precisely in the design; the options are described in our article on the foundation for a factory-built house.

6. Where the water goes

The collected water has to go somewhere. There are four options: a stormwater system where the area has one; a ditch where its use is permitted; a soakaway where the soil allows; or a collection chamber with a pump where the plot is flat and there is no natural fall.

The choice depends on the plot and local requirements and has to be agreed with the local authority. Water must not run onto a neighbour’s land, and that is checked in the occupancy permit procedure, whose requirements are described in our article on the occupancy permit for a house.

Flat coastal plots are the hardest case, with a high water table and salt-laden wind on top of it; we cover them in our article on building a house near the sea.

7. Why it matters especially for a timber house

Concrete and masonry tolerate moisture longer before damage occurs; timber responds with changes in volume and condition. Prolonged damp at the bottom of a wall is the most typical cause of damage in a timber house.

That is why a dry perimeter is part of the design rather than an extra. When drainage around the house, waterproofing, ground falls and the stormwater solution are done together, the timber lasts. The factors behind that lifespan are set out in our article on the lifespan of a timber house.

Denmark house in Kakumäe – a dry perimeter is the precondition for a long-lived timber house
Denmark house in Kakumäe

8. Maintenance, budget and who does the work

Drainage around the house is neither permanent nor maintenance-free. The inspection chambers have to be checked from time to time: is water moving, has silt built up, is the outlet clear. When necessary the system is flushed with a pressure washer. Record their positions in the house documentation and keep them clear in the landscaping design; under a terrace they cannot be reached.

On site the work is done by the same team that builds the foundation, because it goes with the excavation, and the solution comes from the structural engineer on the basis of the ground data.

Ask three things in a quote: whether drainage around the house is included and to what extent, what the backfill material is, and who keeps the chambers accessible once the garden is finished. How that responsibility is divided is described in our article on a construction contract for a turnkey house, and in the budget it belongs with the foundation and site preparation lines, listed in our article on a house building budget.

Iceland house 2.0 – good drainage is invisible until it needs maintaining
Iceland house 2.0

Summary

Whether your plot needs drainage around the house is decided by the soil, the groundwater and the relief, and the answer is in the geotechnical survey rather than in a rule of thumb. If you would like us to look at that data and say what the foundation solution has to contain, write through the contact page.

Get in touch!

For 16 years we have helped people create the home of their dreams. We advise you at every step – from the first question to a home where it feels good to be.

TTUN4139

Your complete new-home solution from a single provider

We offer house design, handle all the paperwork from building permit to occupancy permit, and build turnkey houses. Every house is built to an individual design. Working with our architect, you decide the size, floor plan and finishing materials of your house. We take into account both the shape of your plot and the path of the sun, and we can combine details from different houses to find the solution that suits you best.

We can also build projects that already have a building permit.

icon11

Award-winning design

Functional houses with timeless design and plenty of space
icon3.svg

Energy class A

Heating, ventilation, heat retention
icon1.svg

50-year warranty

On the structure and 2 y. on workmanship
icon8.svg

Choose your size and budget

A floor plan tailored to your wishes and budget
icon6.svg

Built fast

A turnkey house completed in five months

Award-winning CLT element houses with timeless design

Award-winning Happy Home designs and builds designer houses from cross-laminated timber (CLT). We have long-standing experience and offer home solutions for even the most discerning clients.

Our award-winning CLT element houses, with their timeless design, are created by architects, engineers and construction experts working together. Happy Home houses blend naturally into their surroundings and are built to last, in both construction quality and architecture.

We want to inspire people to live more environmentally conscious lives. We build sustainable thinking into each project from the design phase, when the first key decisions about materials and energy efficiency are made.

Yes. To request a price list, send us an enquiry through the form on our website. For an initial overview, we’ll send you sample price lists for our houses, showing design and construction costs as well as possible additional work. We can prepare a quote tailored to your needs after an initial consultation.

Preparing the design usually takes 1–3 months, obtaining the building permit around 2–3 months, and construction about 22 weeks. Interior finishing may extend the construction time. The exact schedule depends on the project, the solutions chosen and how quickly the necessary decisions are made.

Yes. We design every house individually. Working with our architect, you can choose the size, layout and finishing materials of your house. We take into account the characteristics of your plot and the path of the sun, and we can combine solutions from different houses. The floor plans on our website are examples that we can use as a starting point when designing your home.

Yes. Houses under construction can be visited by prior arrangement. We can also meet at our office or hold an initial consultation by phone or video call. We recommend sending us an enquiry before your visit so we can arrange a suitable site and show you the solutions that interest you most.

Yes. We also build houses designed by others. Before construction begins, we review the existing design and adapt the necessary drawings and technical solutions to our construction details.

If you already have a plot, we can handle the design, the documents needed for the building permit application, and the construction. Our scope of work does not include landscaping or furniture. You don’t have to order all the work from us – you can choose which work to order from us and which to arrange yourself.

Over 100 completed projects

Over 100 happy families

If you have a question, would like our price list or want to come and see our houses, write to us or give us a call.

Liisa Nirgi
+372 53 040 040
info@happyhome.ee